Skip to content
rd-skills
All skills

architecture-tradeoff-analysis

FoundationJIT only

analysis-agent: use when architecture options, constraints, material consequences, and exit costs need an evidence-backed comparison; skip when no task-local tradeoff exists.

Group
Architecture & design
Supported roles
MainAnalysisTaskReview
Source
SKILL.md

Use when

Trigger signals that make this skill the right owner

  • compare architecture options constraints forces risks and long term cost

Do not use when

Anti-triggers — as binding as the triggers above

  • no task-local architecture tradeoff analysis decision is required

Required inputs

What must be supplied before this skill can decide anything

  • current task contract
  • selected primary Professional Skill
  • task-local trigger evidence

Output contract

What this skill owes the next role

  • architecture decision comparison with bounded scope, hard constraints, feasible options, material consequences, reversibility and exit path, falsifiable decisive evidence, and owned assumption-change review trigger

Escalation signals

When this skill must hand the decision back

  • Unstated tradeoffs make decisions hard to revisit or defend

Loaded by

This skill never owns a task. These professionals may pull it in as Layer 3.

Targeted references

Each reference carries its own load condition. None of them enter context by default.

ReferenceLoad whenDo not load whenRequired by
checklist.mddecision-checklistSeveral feasibility consequence exit evidence or review-trigger decisions remain open together.The root record already closes boundary feasibility disqualifiers material consequences exit evidence and review triggers.Analysis
evidence-patterns.mdevidence-patternGraph edges boundary claims decisive evidence or decision-to-validation freshness need proof.No source-backed boundary graph feasibility exit or review-trigger claim awaits closure.Analysis
tradeoff-benchmarks.mdbenchmark-patternFeasible options need a qualitative or evidence-supported numeric comparison method.Hard constraints leave one feasible path or current qualitative evidence resolves the choice.Analysis