Skip to content
rd-skills
All skills

reliability-observability-gate

ProfessionalRuntime top level

Use analysis-agent to analyze recovery, SLO, capacity, degradation, and observability; task-agent to change resilience or telemetry; and review-agent to assess evidence. Skip self-review and no-runtime-impact work.

Group
Quality, security, reliability and delivery gates
Routing mode
evidence-only
Supported roles
MainAnalysisTaskReview
Source
SKILL.md

Use when

Trigger signals that make this skill the right owner

  • reliability or recovery risk
  • observability contract change

Do not use when

Anti-triggers — as binding as the triggers above

  • no runtime behavior impact
  • self review request
  • unit test or local performance change with no runtime objective
  • logging field-only change with no reliability decision
  • release ordering only
  • data correctness only

Required inputs

What must be supplied before this skill can decide anything

  • acceptance
  • failure behavior

Output contract

What this skill owes the next role

  • failure model
  • resilience changes
  • reliability verdict

Escalation signals

When this skill must hand the decision back

  • scope, authority, or material risk exceeds the selected task contract

Targeted references

Each reference carries its own load condition. None of them enter context by default.

ReferenceLoad whenDo not load whenRequired by
checklist.mddecision-checklistA bounded L2 mode needs compact checks for the triggered objective, telemetry, alert, dashboard, recovery, or runbook riskThe root contract is enough or mode-specific closure and targeted proof are requiredAnalysisTaskReview
evidence-patterns.mdevidence-patternClosure depends on command/report artifacts, exit code, dashboard/alert proof, incident evidence, freshness, or proof limitsNo reliability claim depends on runtime evidence or the body evidence contract is sufficientAnalysisTaskReview
index.mdindexcompeting reliability observability gate references require dependency, conflict, or output-fragment selectionthe reliability observability gate root or a task-named reference already resolves selectionAnalysisTaskReview
reliability-output-and-gates.mdtargetedL3-L5 work needs mode-specific closure and targeted gates for a selected objective, alert, resilience, telemetry, capacity/cost, recovery, or incident riskA compact L1/L2 result is sufficient and no selected risk needs the extended proof contractAnalysisTaskReview
solution-optimality.mdtargetedAn owned reliability objective, alert strategy, capacity bound, telemetry design, or failure-control choice has a material alternativeNo owned objective or operational decision is affected, or current platform policy and evidence already determine the bounded controlAnalysisTaskReview